8.41 FIGURE 8.12: CONSTRUCTION SITE DEPLOYMENT Step 2: A small power plant, the large living cylinder, and the mast are brought from Earth and assembled . II Step 3: The workshacks and the 60 MW pcwer plant (not shown) are added to the mast. The construction machinery is >osrau.,. rnru Step 4: The frame and cranes are assembled,