yields the equation used in this study to calculate the LOLP for each maintenance interval for the power pools that did not contain a Satellite Power System, where the subscript A indicates th^t this equation holds independently for each maintenance interval, n^ is the number of generators available (not off-line for scheduled maintenance) during the interval, T.
RkJQdWJsaXNoZXIy MTU5NjU0Mg==