1980 Solar Power Satellite Program Review

Perhaps the most important conclusion which can be drawn from this effort is that it appears possible, in terms of availability of eligible rectenna sites and load center distribution throughout the U. S., to site 60 SPS rectennas in a manner generally consistent with existing utility planning practices.

RkJQdWJsaXNoZXIy MTU5NjU0Mg==