DOE Environmantal Assessment Vol2 Detailed

SPS TERRESTRIAL OPERATIONS Fig. 2.1. (Cont’d) _____Launch____________ • Air Pollution Generation (vehicle exhaust, ground cloud) • Water Pollution Generation (launch pad cooling) • Noise (acoustic, sonic boom) • Launch Emergency (abort, off- trajectory failure) • Toxic Material Exposure • High Acceleration/ Deceleration • Ozone Depletion Recovery_______ • Water Pollution Generation (residual propellant spills, ablative material removal) • Noise (sonic boom) • Recovery Emergency • Toxic Material Exposure Ground Station (Rectenna Site) Operation and Maintenance___ High Intensity Electromagnetic Fields Flight Operations

RkJQdWJsaXNoZXIy MTU5NjU0Mg==