1976 NASA SPS Engineering and Economic Analysis Summary

• One satellite per year may not be commensurate with developing a large contribution to energy needs late in the century. • Although the initial engineering position is based on fabrication and assembly in low Earth orbit, a better understanding of fabrication and assembly in geostationary orbit will be most desirable.

RkJQdWJsaXNoZXIy MTU5NjU0Mg==