ESA European Aspects of SPS

B 21 Future Electricity Consumption Center and Forecasts Analysis Discipline: Economy engineering Volume; 4-6 Manmonths Conditions: Identification of greater than 3 GW per 100 km diameter centers / timescale 2000 - 2030 demands Priority: High Iterns: Forecasts of future electricity consumption in Europe / Investigation and selection of future consumption areas vs. time / Development potential of high power density areas B 22 Forecast and Analysis of Future Utility Grid Development Potential Discipline: Electrical engineering Volume: 4-6 Manmonths Conditions: Definition of W.Europe Priority: High Items: DC-distribution potential / Distribution of (Transportation)-Efficiencies / Geographical distribution potential / Distribution cost forecast / Define a reasonable distribution radius (200 - 300 km?) / B 23 General Conditions for Land Based Rectenna Construction (Construction Criteria) Discipline: Structural engineering / Geology Volume: 6-8 Manmonths Conditions: Priority: (very) High Items: Develop Criteria for: Geology/ Topography / Land availability / Environmental conditions /

RkJQdWJsaXNoZXIy MTU5NjU0Mg==