JPL Preliminary Examination of SPS Occupational Health

entires in Table 8 are normalized by 1.325 x 10^ MW-yr, which is the total number of MW-yr produced in Scenario A when the SPS stations and the rectennas operate at a load factor of 0.92. Table 8. Normalized Occupational Health Impacts on the Ground for the Total SPS Scenario A