TABLE V-l.- ORBITAL CONSTRUCTION EQUIPMENT REQUIREMENTS It is expected that more personnel will be required in space for modular construction in LEO with final assembly in GEO. The same construction functions must be performed in LEO; in addition, the assembly of the modules in GEO must be accomplished. A summary of peak crew requirements for the two configurations and different construction locations are as follows. The estimated crew requirements for the truss configuration with primary construction in LEO were done in less detail than the other two cases.