specialization may not be achievable with a crew of this size. Since some maintenance will require at least a partial shutdown of the SPS, it also will be desirable to minimize the down time with a larger crew. Assuming three work shifts and considering the size of the SPS, it would be possible to utilize almost any number of technicians. A practical limit may be established by the capacity of the personnel orbital transfer vehicle and the capacity of a construction habitation module.