1976 JSC Evaluation Of SPS Vol2

TABLE V-3-4 SPS FUNCTIONAL SUPPORT EQUIPMENT IDENTIFICATION GEO CONSTRUCTION BASE Logistics Facility (Continued). Docking port module. Docking/servicing maintenance module. Transit system (attached trolley). Used as a loading/un- loading "platform" for arriving and departing LEO-GEO vehicles. Provide vehicle and construction equipment docking, servicing, refurbishment, and maintenance services. Provides transportation for personnel and materials. Accommodates transit vehicles for docking and undocking operations. Payload transfer to storage module. Staging area for on call rescue vehicles. Maintenance and repair/ refurbishment of LEO- GEO engines. Vehicle systems. GEO electronic submodules. Remote control manipulators. Fueling operations. Transport personnel and materials from habitat to work site and element to element within construction base. Emergency rescue. Standardized docking ports/systems. Loads attentuation. Emergency release. Automatic control. Target alignment system. Electrical power. ECLS, EVA. Docking mechanisms. Electronic systems. Fueling systems. Maintenance systems. Payload handling and transfer. Cable and track system. Electrical Dower. Communications. ECLS. Emergency escape. Lighting system. Vehicle control.

RkJQdWJsaXNoZXIy MTU5NjU0Mg==