NASA 2024 Space-Based Solar Power

60 Cost Estimate Results (FY22$) RD1 Baseline ($) RD2Baseline ($) Mission Operations & Data Analysis - Assembly 106.8M 182.4M Assemble Total 78.9B 124.1B Table 18. SBSP Lifecycle Costs for the Operate ConOps Phase Cost Estimate Results (FY22$) RD1 Baseline ($) RD2 Baseline ($) Mission Operations & Data Analysis - Operations 432M 432M Ground System 3.1B 8.27B Spacecraft Shielding 246M 666M Operate Total 3.79B 9.36B Table 19. SBSP Lifecycle Costs for the Maintain ConOps Phase Cost Estimate Results (FY22$) RD1 Baseline ($) RD2 Baseline ($) Maintenance Modules and Servicers 21.2B 21.1B Mission Program Management, Systems Engineering, and Mission Assurance 5.3B 5.27B Launch of Maintenance Hardware 130.39B 222.1B Orbital Assembly of Maintenance Hardware 213.6M 364.8M Maintain Total 157.15B 248.85B Table 20. SBSP Lifecycle Costs for the Dispose ConOps Phase Cost Estimate Results (FY22$) RD1 Baseline ($) RD2 Baseline ($) ADR Vehicle Manufacturing 18.5B 29B ADR Vehicle Management, Operations, and Ground Costs 4.68B 7.3B

RkJQdWJsaXNoZXIy MTU5NjU0Mg==