A Survey of SPS 1976 PRC

elements should be sealed in protective tubing to prevent damage from large hailstones (Ref. All) . The interface with the power utility network has not yet received much attention, but some form of power conditioning may be required. If utilities continue to utilize ac, the rectenna power would have to be converted from de to ac. If de power transmission should become feasible, the rectenna power would not require conversion.