SPS Hearings, 94th Congress January 1976

7 - OPERATIONS • Assembly System Studies Determine Cost-Effective Use of Man-In-Space Assembly Tradeoff Space Fabricated Vs Ground Fabricated Deployable Structure Vs Other Tradeoff Joining & Fastening Techniques & Equipments Tradeoff LEO Vs GEO Assembly Site • Assembly Concept Definitions Design Options for Remote Controlled Assembly Aids Design Options for Mobility Units Design Options for EVA Equipments Design Options for Materials & Propellant Storage Design Concepts for Mission Control & Data Acquisition & Tracking Network • Other Supporting Studies Simulation: Manned & Remote Controlled Maintenance & Repair Operations

RkJQdWJsaXNoZXIy MTU5NjU0Mg==